Safety 1st Advancer Betreibershandbuch Seite 95

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 132
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 94
Environmental Remediation Drilling
Safety Guidelines
Page 95 of 132
SECTION 5 - WELL CONSTRUCTION, DEVELOPMENT, AND ABANDONMENT
5.1 - Introduction
Well construction consists of placing a well screen and casing (riser) into the open borehole. A drawing is
provided as Attachment 5.A - Simplified Well Construction Diagram. The materials of construction can
include screen and blank casing composed of polyvinyl chloride (PVC), low carbon steel, fiberglass,
stainless steel, and other more exotic materials. Annular materials such as gravel or filter pack (surrounding
the screen), fine sand seal, (above the gravel pack), bentonite pellets, (above the fine sand seal) and a
grouting material (impervious materials such as cement or high-solids bentonite grout) are placed in the
annulus between the borehole and screen or riser casing, after the screen and casing are installed. Finally a
surface completion consisting of a well pad, locking riser and protective bollards are installed to protect the
above ground portions of the well.
Well development includes the operations, performed on the constructed well, which mitigate the formation
damage caused by the drilling methods. Both chemical and physical techniques can be used during well
development operations. Chemical methods include treating the well with specialty chemicals such as
polyphosphates, acids and other specific compounds designed to increase the flow from the formation into
the well. Physical methods may include, high pressure jetting of water into the well, surging, bailing,
swabbing or even the introduction of dry ice or compressed air into the well to create a low pressure
environment inside the well screen and casing.
Well abandonment activities are performed on extraction, injection and monitor wells when the well is no
longer needed for its intended function. Wells can be abandoned by simply installing and impermeable
material (grout) inside of the well, or requirements may dictate that the entire well must be removed from
the ground (over drilling).
5.2 - Roles and Responsibilities
In most instances the consultant or owner determines the depth of the well and the precise location of the
well materials. The data are then provided to the driller who physically installs the well materials into the
borehole. Depending on the contractual arrangements, the driller or owner may purchase the well materials
and transport the materials to the actual well site. Well development criteria are also provided to the driller
by the owner or consultant. Finally, well abandonment parameters are many times determined by state and
local regulations.
Seitenansicht 94
1 2 ... 90 91 92 93 94 95 96 97 98 99 100 ... 131 132

Kommentare zu diesen Handbüchern

Keine Kommentare