Environmental Remediation Drilling
Safety Guideline
Page 58 of 132
4.5.14 - Underground utilities
• Complete utility locates prior to drilling [One Call: 811 or your local utility locating service] and
coordinate with the drilling contractor and site personnel.
• Mark locations in white
• Field verify utility locations
• Document all utility locates on a plot plan or other map of the site.
• Observe the area for indications of utilities
• Hand dig if questions remain or if required by the property owner
• Refer to your specific Utility Clearance and Isolation procedure
4.5.15 - Environmental Contamination (if applicable)
• Before Visqueen or other plastic is laid down, the site will be cleared of trip hazards, obstacles or debris
such as rocks, sticks, ruts and holes.
• Contain cuttings in drums or plastic sheeting
• Wear proper PPE and minimize contact with soil, sediment, groundwater, or other contamination.
• Work upwind of the boring
• If unusual soil discoloration or odors are encountered, stop work, evacuate area and contact the safety
manager. The approach will need to be re-evaluated and a PPE upgrade may be required
• Follow all provisions of the Health and Safety Plan
4.5.16 - Working on Streets or Highways
• Follow state and local laws concerning traffic control signage, cones, and barricades.
• Do not work before sun-up, after sundown, or any time visibility is poor.
• Position support vehicle(s) between the work area and oncoming traffic.
• Use safety strobe lights on all vehicles and equipment.
• Wear appropriate reflective safety vests.
• Use radios when flagging.