Environmental Remediation Drilling
Safety Guidelines
Page 19 of 132
2.4 - Positioning the Borehole
Some of the tasks involved in positioning the borehole can take place in the office. It is important to gather
all the relevant information about each site to assist in identifying hazards, locations, and the necessary
permits.
It is difficult to predict all problems that may occur during drilling fieldwork activities. Completing pre-
fieldwork preparations will help to ensure that the project proceeds on schedule and in a safe manner. The
project work plan should include (if applicable and available):
Maps and figures showing underground and aboveground equipment, piping, utilities and/or any surface
or subsurface hazards,
Historic site information (maps, photos, files),
Site as-built drawings,
Easement maps,
o Historic plot plans,
Previous site investigations,
Fire insurance plans,
Tank dip charts, and
Elevations and coordinates maps.
It is helpful to interview individuals who may have historical information. These individuals may be retired
at the time the work is conducted, but may still have information needed to help avoid damaging
underground facilities.
During pre-planning and site investigations, keep good notes, document preparation activities, question
personnel who have historic site knowledge, identify below and above ground providers and services, and
identify critical areas. Critical areas are those within ten feet of any structures or general high pressure
pipeline corridor. If critical areas are encountered, there could be dramatic health, environmental, or
operational impacts. Some examples of critical areas include: general high pressure pipeline corridors,
underground storage tanks (USTs), utility lines, areas between an UST and a dispenser, areas between a
dispenser rack and the building, areas within ten feet of the dispenser island canopy drip line, and overhead
power or utility lines. Critical areas should be twice reviewed and hole clearance procedures completed
prior to the drill team drilling.