Environmental Remediation Drilling
Safety Guidelines
Page 129 of 132
CATEGORY INSPECTION ITEMS PASS FAIL N/A ACTION
NEEDED
Flights/Augers
(cont.)
Inspect flights/augers for metal burrs. NOTE: Burrs must be filed to flat
surface.
Avoid stacking augers; all should lay flat on ground.
Avoid manually lifting/moving augers. Should be lifted/moved with cable
lines, or, at a minimum, by two persons.
Drill String
Drill string should not be bent or have any cracks/fractures.
Drill string connecting pins should not be bent, have any cracks/fractures,
or be excessively worn.
Mast
Mast is free of bends, cracks, or broken sections.
All mounting hardware (pins, bolts, etc.) should be in place.
No moving of drill rig while mast is in vertical position.
Maintenance/repairs to be performed on mast only in horizontal position.
Hammering
Device
Hammer free of cracks, fatigue, or other signs of excessive wear.
Hammer connections are secure.
Leveling
Devices
Outriggers move in/out and up/down smoothly and freely while using
controls on drill rig, with no hydraulic leaks.
Outriggers are extended prior to and whenever the mast is raised off its
cradle. Outriggers must maintain pressure to continuously support and
stabilize the drill rig (even while unattended).
Outriggers are properly supported on the ground surface to prevent
settling into the soil (use of outrigger support pads).
Controls
Controls are intact, properly labeled, have freedom of movement, and
have no loose wiring or connections.
Controls are not blocked or locked into an operating position.
Installed lights, signals, gauges, and alarms operate properly.
Lifting Devices
Slings, chokers, and lifting devices are inspected before using and are in
proper working order. NOTE: Damaged units are to be labeled and
removed from jobsite.
Shackles/Clevises are in proper working order with pins/ screws in place
that is to be used while lifting.
Cables and lifting devices are not operated erratically or with a jerking
action to overcome resistance.
Hydraulic
System
Hydraulic lines are secure, in good condition with no signs of excessive
wear, and not leaking. NOTE: Check while pressurized.
Hydraulic lines are not in a bent or pinched position causing additional
fluid restrictions/pressures.
Hydraulic oil reservoir has appropriate amount of oil and not leaking.
Documentation available to confirm that pressure relief valve was
checked during shop maintenance activity and noted on maintenance log.
Pump Lines
(water, grout,
etc.)
Suction/Discharge hoses, pipes, valves, and fittings are secured and not
leaking.
High pressure hoses have a safety chain, cable, or strap at each end to
prevent whipping in the event of a failure.
Fire
Prevention
A fire extinguisher of appropriate size is located on drill rig and readily
available/accessible for drilling crew (recommended 20 lb.).
Documentation available to confirm that the drilling crew has received
training on proper use of fire extinguishers.
Ladders
Drill rig has a permanently attached or proper portable ladder to be used
for access to drilling platform.
Tracks
Tracks on rig are not excessively worn and free of any debris or foreign
material.